New Form Building Systems
90 Heritage Park Rd., Ste 2
Bucksport, ME 04416
Office:  207-469-2711

Fax:  207-469-3567

 
 


ICF BENEFITSLOCAL GALLERYBUILDERSRETAIL LOCATIONSCONCRETE PUMPINGESTIMATINGINSTALLATIONICF SPECSACCESSORIES
RESOURCESABOUT USCONTACT USHOME


 


 


 

Steps to Estimating
Manual Estimating Method:
How to Estimate Your Project

Follow the instructions below to estimate how many BuildBlock forms you'll need for your construction project.
 
  1. Divide wall height by 16” and round up. This is the number of courses required.
     
  2. Multiply the # of 90° corners in the structure by the # of courses required. This is the number of 90° corner forms required.
     
  3. Multiply the # of 45° corners in the structure by the # of courses required. This is the number of 45° corner forms required.
     
  4. Use the chart below to determine the total square footage of all 90° forms to be used.  (Number of 90° forms multiplied by sq. ft. per form.) Do the same for the 45° forms.
     
  5. Determine the total square foot area of wall being formed (width x height, minus 80% of window and door openings). Subtract total square foot of all 90° forms to be used and all 45° forms to be used.
     
  6. Divide the remaining square footage of the wall by 5.33 to determine the number of straight forms required. Add a small number of forms for possible waste.
     
  7. Estimate the concrete volume required by the following: Divide total square footage of wall to be formed, including corners, by 53 or 40 (for 6” or  8” forms, respectively). This equals the number of cubic yards of concrete required. Add 1.5 additional yardage for waste and the pump. (You do not want to be short on concrete. Delays are too expensive on manpower and pump costs.)

 

 

Square Foot per Block Chart

  6" concrete 8" concrete
Straight block

5.33

5.33

90° Corner block

6.00

6.44

45° Corner block

4.89

4.89

 
 

 

  New Form Building Systems |  New Form Supply