New Form Building Systems
90 Heritage Park Rd., Ste 2
Bucksport, ME 04416

Phone:  207-469-2711

Fax:  207-469-3567

 
 


ICF BENEFITSPICTURE GALLERYBUILDERSRETAIL LOCATIONSCONCRETE PUMPINGESTIMATINGINSTALLATIONICF SPECSACCESSORIES
RESOURCESABOUT USCONTACT USHOME




 

Start to Finish

Pictures


 

Building the Basement & Masonry Heater Foundation

Radiant Heat

Pouring slab

Slab/Footings Ready

First Course

Zip tie corners

Dowels

Light forms

Easy construction

Gluing blocks for Plumwall Bracing

Bracing in Place

Putting on Top Bracket

Checking with a Level

Window Bracing in Place

Start of Stove Foundation

 

First Pour

Concrete Pump

Connection for Garage Wall

Russian Stove Foundation

Beam Pocket

Utility Openings

Opening for hose connection

Canterlever Openings for Deck

Starting to Pump Stove Foundation

Vibrating to Consolidate Concrete

ICF Connect for Floor's Ledger Boards

Vertical and Horizontal Rebar

Starting to Pump Exterior Walls

Pump Operator

Opening under window buck (empty)

Opening under window buck (full)

Cuts on short wall strapped

Last time around

Pump operator

Finishing up with Consolidation

Starting the First Story

Platon Membrane on Exterior Wall Below Grade

Platon Membrane Attached

Peel & Stick around Walk out Basement

Cantelever Openings

Utilities Opening

Beam on Masonry Foundation

Beam in Beam Pocket

Backfilling

Solar Panels Installed

Solar

Placing Bucks

Starting ICF on Next Story

Making Window Bucks

ICF Connect for Deck and Platon Membrane Top

Soprema Peel & Stick

Corner in between two window bucks

Opening in window buck

Ties inset in Polystyrene

Ties

Bracing going up 7/13

 

Ready to Pour First Story and Garage

Three Car Garage

Homeowners in kitchen area

Beam Pocket

Basement

Basement

 

Second Pour

Adjusting bracing to level wall

Gables and Third Pour

Getting Weathered In

Roof & Gables

 

 

 
 New Form Building Systems |  New Form Supply