Building the Basement & Masonry Heater
Foundation
|
|
|
Radiant Heat
|
|
|
|
Pouring slab
|
|
|
|
|
Slab/Footings Ready
|
|
|
|
|
|
First Course
|
|
|
|
|
Zip tie corners
|
|
|
|
|
Dowels
|
|
|
|
|
Light forms
|
|
|
|
Easy construction
|
|
|
|
|
Gluing blocks for Plumwall Bracing
|
|
|
|
|
|
|
|
Bracing in Place
|
|
|
|
Putting on Top Bracket
|
|
|
|
Checking with a Level
|
|
|
|
|
|
Window Bracing in Place
|
|
|
|
Start of Stove Foundation
|
|
|
First Pour
|
|
|
Concrete Pump
|
|
|
|
|
|
|
Connection for Garage Wall
|
|
|
|
|
Russian Stove Foundation
|
|
|
|
Beam Pocket
|
|
|
|
Utility Openings
|
|
|
|
Opening for hose connection
|
|
|
|
Canterlever Openings for Deck
|
|
|
|
|
Starting to Pump Stove Foundation
|
|
|
|
|
|
Vibrating to Consolidate Concrete
|
|
|
|
ICF Connect for Floor's Ledger Boards
|
|
|
|
|
Vertical and Horizontal Rebar
|
|
|
|
Starting to Pump Exterior Walls
|
|
|
|
|
Pump Operator
|
|
|
|
|
|
Opening under window buck (empty)
|
|
|
|
Opening under window buck (full)
|
|
|
|
Cuts on short wall strapped
|
|
|
|
Last time around
|
|
|
|
Pump operator
|
|
|
|
|
|
|
Finishing up with Consolidation
|
|
|
Starting the First Story
|
|
|
Platon Membrane on Exterior Wall Below Grade
|
|
|
|
Platon Membrane Attached
|
|
|
|
Peel & Stick around Walk out Basement
|
|
|
|
|
Cantelever Openings
|
|
|
|
|
Utilities Opening
|
|
|
|
Beam on Masonry Foundation
|
|
|
|
Beam in Beam Pocket
|
|
|
|
Backfilling
|
|
|
|
Solar Panels Installed
|
|
|
|
|
Solar
|
|
|
|
|
|
|
|
|
|
Placing Bucks
|
|
|
|
Starting ICF on Next Story
|
|
|
|
Making Window Bucks
|
|
|
|
|
|
|
|
ICF Connect for Deck and Platon Membrane Top
|
|
|
|
Soprema Peel & Stick
|
|
|
|
Corner in between two window bucks
|
|
|
|
|
Opening in window buck
|
|
|
|
|
|
Ties inset in Polystyrene
|
|
|
|
Ties
|
|
|
|
|
|
Bracing going up 7/13
|
|
|
|
|
|
|
|
|
|
Ready to Pour First Story and
Garage
|
|
|
Three Car Garage
|
|
|
|
|
|
|
|
|
|
Homeowners in kitchen area
|
|
|
|
Beam Pocket
|
|
|
|
Basement
|
|
|
|
Basement
|
|
|
|
|
|
|
Second Pour
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Adjusting bracing to level wall
|
|
|
Gables and Third Pour
Getting Weathered In
|
|
|
Roof & Gables
|
|
|
|
|
|
|
|